Dear Mr Rajaram,

I have enclosed detailed estimate of construction of School building at akkaraipettai . As we have discussed at school site ,the plan was prepared for constructing Ground floor as extension of existing new building ( Donated by Tirupur party) after demolishing the toilet and construction of first floor. 

Ground floor 443 Sq ft + Varanda 78 Sq ft = 521 Sq ft 
First floor 1673 Sq ft + varanda 291 Sq ft = 1964 Sq ft
   
Construction cost 9,94,293.00
Cost for New toilet construction 1,00,000.00
Cost for raising level of play ground (which frequently gets water logged) 50,000.00
Total  11,44,293.00
Engineer fees 6% of total cost  65,000.00
Total  12,09,293.00


Thanking you,

Yours sincerely,

Seetharam